How we work
From the first walk-around to the maintenance sheet
Six steps, in this order. You see a price in writing before the third one ends.
Step 1: The site visit
Cecilia or Anahi walk the place, measure the roof, see where water collects now and ask what you want it to do. For a tap you will drink from, we take the sample.
Step 2: The drawing
Cecilia draws one sheet: roof, route, tank, overflow, filters and the hose bibs. You can ask for it in Spanish.
Step 3: The written estimate
Every part and every hour is listed, with what is not included. Nothing is ordered until you sign.
Step 4: The permit
Anahi tells you which permits apply, prepares the paperwork and brings it to you to sign.
Step 5: The install
Alfredo's crew sets the pad or digs the trench, sets the tank, runs the lines and fits the filters and screens.
Step 6: The test and the hand-over
A flush, a leak check and a lab sample for any drinking tap. We walk you through it and leave a one-page maintenance sheet at the tank.
After we leave
A system you can keep running yourself
Most of the upkeep is a screwdriver and a calendar: clear the screens, check the first-flush diverter, change the filters when the sheet says. If something needs a plumber, call us, and we'll know the system because we drew it.

Book the site visit
It's where every system starts.